Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Bionic Training

Basel
Leisure/Culture
Text Link
Health
Text Link

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

  • Client
  • Bionic BS
    Bionic BS
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Tenant fit out
  • Duration
  • 04.2016
    —heute
    —07.2016
    0 Days
Bionic Training

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Bionic Training

Für ein junges start-up Unternehmen aus Basel haben Blaser Architekten das Bionic-Konzept mit gezielten und wirkungsvollen Eingriffen räumlich umgesetzt.

Die günstig gelegene Mietfläche im Erdgeschoss des Geschäftshauses 'Warteck’ wurde in einen zur Strassenseite hin orientierten Empfangs- und Trainingsraum und in einen rückwärtigen Bereich mit Lounge und hochwertigen Umkleide- und Duschkabinen mit Wellnessambiente unterteilt. Der Trainingsraum mit den vier Trainingsgeräten und der edlen Einrichtung ist über die Schaufenster grossflächig einsehbar und wirkt einladend. Es freut uns, dass das Konzept in Basel erfolgreich gestartet ist und wir im 2018 bereits eine zweite Filiale im Anfoshaus in Basel umsetzten konnten.

Project information

Blaser Architekten realised the Bionic concept for a young start-up company from Basel with targeted and effective spatial interventions.

The conveniently located rental space on the ground floor of the 'Warteck' commercial building was divided into a reception and training room facing the street and a rear area with a lounge and high-quality changing rooms and shower cubicles with a wellness ambience. The training room with its four training machines and elegant furnishings can be seen from a large area through the shop windows and has an inviting appearance. We are delighted that the concept got off to a successful start in Basel and that we were able to open a second branch at Anfoshaus in Basel in 2018.

Technical Planning

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Construction of a forest hut in Niederhelfenschwil as part of the television programme 'SF Schweiz aktuell'.

Forest cabin

Construction of a forest hut in Niederhelfenschwil as part of the television programme 'SF Schweiz aktuell'.

Mieterausbauten HORTUS

HORTUS

Tenant Fit-Outs HORTUS – Flexible and Sustainable Working in Allschwil

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Friedensgasse

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Competition for the new headquarters of Swatch AG in Biel in collaboration with Shigeru Ban Architects.

Swatch Omega SO51

Competition for the new headquarters of Swatch AG in Biel in collaboration with Shigeru Ban Architects.

Designetwurf by Studiopez

Competition Teatro Kursaal di Locarno

Participation in the Competition: Harmonious Redesign of Teatro and Kursaal Locarno.

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Dreispitz university quarter study contract

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Extension to a detached house in Bottmingen built by Blaser Architekten.

Extension SFH Bottmingen

Extension to a detached house in Bottmingen built by Blaser Architekten.

Installation of a highly sensitive B laboratory for a major healthcare company in Basel.

Biosafety Facility

Installation of a highly sensitive B laboratory for a major healthcare company in Basel.

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

Huntsman Advanced Materials

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.