Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Bau 860

Basel
Office/Administration
Text Link

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

  • Client
  • Swiss Prime Site Immobilien AG
    Swiss Prime Site Immobilien AG
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 02.2017
    —heute
    —11.2017
    0 Days
Bau 860

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Bau 860

Blaser Architekten AG were commissioned to remodel the first floor of the office building on the edge of Stücki Park. The property was built in 1958, and the original layout of the floor plan in cellular offices along the façade created a very dark centre and common area.

The new open-plan office with separate kitchen area and large meeting room offers plenty of daylight throughout. A meeting alcove and the copy room with partially translucent walls were built into the core zone of the open space. The workstations are located along the façade. The ceiling was stripped back to the concrete ribs and fitted with acoustic ceiling sails.

Project information

  • GV SIA 416 m3
  • 1'046
  • GF SIA 416 m2
  • 328
  • Nutzfläche m2
  • 279
  • Nachhaltigkeit
  • DGNB
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik
  • Schnetzer Puskas Ingenieure AG
  • Elektro
  • Schachenmann + Co AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

New construction of a spacious detached house with a view of the Passwang.

SFH Himmelried

New construction of a spacious detached house with a view of the Passwang.

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Market hall

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

Credit Suisse Reinach

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

Conversion of a commercial and apartment building into a spacious detached house.

SFH Riehen

Conversion of a commercial and apartment building into a spacious detached house.

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Dreispitz university quarter study contract

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Novartis Campus WSJ-182

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Classroom

Limmattal Vocational School

New extension for the Limmattal cantonal school in Urdorf near Zürich due to the sharp rise in pupil numbers.

Mieterausbauten HORTUS

Tenant Fit-Out HORTUS

Tenant Fit-Outs HORTUS – Flexible and Sustainable Working in Allschwil

Renovation of the entire property in Basel's shopping mile with new utilisation of the building.

Freie Strasse residential and commercial building

Renovation of the entire property in Basel's shopping mile with new utilisation of the building.

Installation of a technology park for start-up companies in Stücki Park Basel.

Technology Park I

Installation of a technology park for start-up companies in Stücki Park Basel.