Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

Huntsman Advanced Materials

Basel
Office/Administration
Text Link

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

  • Client
  • Huntsman Advanced Materials
    Huntsman Advanced Materials
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 02.2014
    —heute
    —02.2015
    0 Days
Huntsman Advanced Materials

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Huntsman Advanced Materials

The commercial building from the 1930s and 1960s with individual offices and laboratories was remodelled on the fifth floor for the American chemical company Huntsman. More specifically, the existing office structure was opened up and modernised. Most of the existing cellular offices were converted into multi-space offices for the 125 employees of the Advanced Materials division at the Basel site.

In addition to the new multi-space, a new cafeteria, kitchenettes and lounge areas were also created. The main focus of the remodelling was to open up the space and provide natural light to the inner, previously built-up zones. The result was a spacious, bright working environment, which Huntsman was able to move into after a six-month construction period.

Project information

  • GV SIA 416 m3
  • 8'550
  • GF SIA 416 m2
  • 2'250
  • Nutzfläche m2
  • 1'800
  • Nachhaltigkeit
  • DGNB
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Elektro
  • Schwarz + Partner AG
  • HLKK
  • Advens AG
  • Sanitär
  • Haldemann Basel
  • Brandschutz
  • Visiotec Technical Consulting AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Renovation of the building envelope of an apartment block with enlargement of the balcony areas.

MFH C.F Meyer-Strasse 54

Renovation of the building envelope of an apartment block with enlargement of the balcony areas.

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

Credit Suisse Reinach

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

Der Lichthof

Spenglerpark Münchenstein

Orchestration and realisation of various measures in the overall complex of the Spenglerpark Münchenstein.

Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.

Alte Börse

Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Swissmetal site development

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Expansion of a Credit Suisse branch in Allschwil.

Credit Suisse Allschwil

Expansion of a Credit Suisse branch in Allschwil.

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Novartis Campus WSJ-182

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

Competition Art Museum

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

Credit Suisse Claraplatz

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

Construction of a new day care centre in Stein (AG) for the children of Novartis employees.

Day care centre Stein

Construction of a new day care centre in Stein (AG) for the children of Novartis employees.