Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

Huntsman Advanced Materials

Basel
Office/Administration
Text Link

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

  • Client
  • Huntsman Advanced Materials
    Huntsman Advanced Materials
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 02.2014
    —heute
    —02.2015
    0 Days
Huntsman Advanced Materials

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Huntsman Advanced Materials

The commercial building from the 1930s and 1960s with individual offices and laboratories was remodelled on the fifth floor for the American chemical company Huntsman. More specifically, the existing office structure was opened up and modernised. Most of the existing cellular offices were converted into multi-space offices for the 125 employees of the Advanced Materials division at the Basel site.

In addition to the new multi-space, a new cafeteria, kitchenettes and lounge areas were also created. The main focus of the remodelling was to open up the space and provide natural light to the inner, previously built-up zones. The result was a spacious, bright working environment, which Huntsman was able to move into after a six-month construction period.

Project information

  • GV SIA 416 m3
  • 8'550
  • GF SIA 416 m2
  • 2'250
  • Nutzfläche m2
  • 1'800
  • Nachhaltigkeit
  • DGNB
  • Fotografie
  • Michael Fritschi

Technical Planning

  • Elektro
  • Schwarz + Partner AG
  • HLKK
  • Advens AG
  • Sanitär
  • Haldemann Basel
  • Brandschutz
  • Visiotec Technical Consulting AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Novartis Campus WSJ-386 ONC

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Bau 860

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Friedensgasse

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

Conversion of a commercial and apartment building into a spacious detached house.

SFH Riehen

Conversion of a commercial and apartment building into a spacious detached house.

Renovation of the entire property in Basel's shopping mile with new utilisation of the building.

Freie Strasse residential and commercial building

Renovation of the entire property in Basel's shopping mile with new utilisation of the building.

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

SFH Pfeffingen

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

View of the reception desk

Medical practice OrthoPlusBasel

Installation of a medical practice for orthopaedics, traumatology and rheumatology in a newly renovated commercial building.

Work table with children's toys

Rear building Austrasse

Remodelling of a former workshop building in the rear courtyard and usable space in the front building for Heime Auf Berg AG.

Expansion of the Basel Technology Park in Stücki Park.

Technology Park II

Expansion of the Basel Technology Park in Stücki Park.

View from the atrium through the glass to the floors of the building

Campus Bildung Gesundheit

Refurbishment and equipping of the Campus Bildung Gesundheit at Spenglerpark in Münchenstein.