Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

Huntsman Advanced Materials

Basel
Office/Administration
Text Link

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

  • Client
  • Huntsman Advanced Materials
    Huntsman Advanced Materials
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 02.2014
    —heute
    —02.2015
    0 Days
Huntsman Advanced Materials

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Huntsman Advanced Materials

The commercial building from the 1930s and 1960s with individual offices and laboratories was remodelled on the fifth floor for the American chemical company Huntsman. More specifically, the existing office structure was opened up and modernised. Most of the existing cellular offices were converted into multi-space offices for the 125 employees of the Advanced Materials division at the Basel site.

In addition to the new multi-space, a new cafeteria, kitchenettes and lounge areas were also created. The main focus of the remodelling was to open up the space and provide natural light to the inner, previously built-up zones. The result was a spacious, bright working environment, which Huntsman was able to move into after a six-month construction period.

Project information

  • GV SIA 416 m3
  • 8'550
  • GF SIA 416 m2
  • 2'250
  • Nutzfläche m2
  • 1'800
  • Nachhaltigkeit
  • DGNB
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Elektro
  • Schwarz + Partner AG
  • HLKK
  • Advens AG
  • Sanitär
  • Haldemann Basel
  • Brandschutz
  • Visiotec Technical Consulting AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Friedensgasse

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

New replacement building in the zone of buildings worthy of protection in Basel city centre.

Falknerstrasse residential and commercial building

New replacement building in the zone of buildings worthy of protection in Basel city centre.

View of the aisle area with round play corner

SIS Schule

Tenant fit-out for the Swiss International School in Building D of the Main Campus Allschwil.

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Bionic Training

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.

Landgasthof Riehen

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.

Refurbishment of a residential building with newly constructed duplex flats on the top floor.

MFH Burgunder­strasse

Refurbishment of a residential building with newly constructed duplex flats on the top floor.

Rental flats and furnished flats in a residential and commercial building near Schützenmattpark.

Apartementhouse Weiherweg

Rental flats and furnished flats in a residential and commercial building near Schützenmattpark.

Designetwurf by Studiopez

Competition Teatro Kursaal di Locarno

Participation in the Competition: Harmonious Redesign of Teatro and Kursaal Locarno.

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

HORTUS_Switzerland Innovation Park Basel Area – Main Campus.

SIP HORTUS

Tenant Fit-out HORTUS – Flexible and Sustainable Working at the Switzerland Innovation Park Basel Area – Main Campus.