Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

Huntsman Advanced Materials

Basel
Office/Administration
Text Link

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

  • Client
  • Huntsman Advanced Materials
    Huntsman Advanced Materials
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 02.2014
    —heute
    —02.2015
    0 Days
Huntsman Advanced Materials

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Huntsman Advanced Materials

The commercial building from the 1930s and 1960s with individual offices and laboratories was remodelled on the fifth floor for the American chemical company Huntsman. More specifically, the existing office structure was opened up and modernised. Most of the existing cellular offices were converted into multi-space offices for the 125 employees of the Advanced Materials division at the Basel site.

In addition to the new multi-space, a new cafeteria, kitchenettes and lounge areas were also created. The main focus of the remodelling was to open up the space and provide natural light to the inner, previously built-up zones. The result was a spacious, bright working environment, which Huntsman was able to move into after a six-month construction period.

Project information

  • GV SIA 416 m3
  • 8'550
  • GF SIA 416 m2
  • 2'250
  • Nutzfläche m2
  • 1'800
  • Nachhaltigkeit
  • DGNB
  • Fotografie
  • Michael Fritschi

Technical Planning

  • Elektro
  • Schwarz + Partner AG
  • HLKK
  • Advens AG
  • Sanitär
  • Haldemann Basel
  • Brandschutz
  • Visiotec Technical Consulting AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

New location for the SSEF (Swiss Gemmological Institute) with spacious, state-of-the-art laboratories.

Stiftung Schweizer­isches Gemmolo­gisches Institut

New location for the SSEF (Swiss Gemmological Institute) with spacious, state-of-the-art laboratories.

New construction of a high-quality residential development consisting of four buildings in the villa neighbourhood of Binningen.

Hasenrain residential estate

New construction of a high-quality residential development consisting of four buildings in the villa neighbourhood of Binningen.

Competition for the new headquarters of Swatch AG in Biel in collaboration with Shigeru Ban Architects.

Swatch Omega SO51

Competition for the new headquarters of Swatch AG in Biel in collaboration with Shigeru Ban Architects.

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

View of the aisle area with round play corner

SIS Schule

Tenant fit-out for the Swiss International School in Building D of the Main Campus Allschwil.

New replacement building in the zone of buildings worthy of protection in Basel city centre.

Falknerstrasse residential and commercial building

New replacement building in the zone of buildings worthy of protection in Basel city centre.

State-of-the-art operating unit for training purposes

Training center Medartis

Installation of state-of-the-art operating units as well as open office space and meeting zones for the International Bone Research Association (IBRA)

Fire protection refurbishment of a car park combined with a refurbishment.

Car park Hochbergerstrasse

Fire protection refurbishment of a car park combined with a refurbishment.

Installation of a Ferrari-Maserati garage in existing shed halls.

Ferrari Maserati garage

Installation of a Ferrari-Maserati garage in existing shed halls.

View top-floor apartment

Multi-family house in Binningen

New construction of a modern multi-family residence in Binningen – urban living with timeless design.