Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

Huntsman Advanced Materials

Basel
Office/Administration
Text Link

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

  • Client
  • Huntsman Advanced Materials
    Huntsman Advanced Materials
  • Location
  • Basel
  • Mandate form
  • Architect
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Interior design
    Conversion/Renovation
  • Duration
  • 02.2014
    —heute
    —02.2015
    0 Days
Huntsman Advanced Materials

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Huntsman Advanced Materials

The commercial building from the 1930s and 1960s with individual offices and laboratories was remodelled on the fifth floor for the American chemical company Huntsman. More specifically, the existing office structure was opened up and modernised. Most of the existing cellular offices were converted into multi-space offices for the 125 employees of the Advanced Materials division at the Basel site.

In addition to the new multi-space, a new cafeteria, kitchenettes and lounge areas were also created. The main focus of the remodelling was to open up the space and provide natural light to the inner, previously built-up zones. The result was a spacious, bright working environment, which Huntsman was able to move into after a six-month construction period.

Project information

  • GV SIA 416 m3
  • 8'550
  • GF SIA 416 m2
  • 2'250
  • Nutzfläche m2
  • 1'800
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Elektro
  • Schwarz + Partner AG
  • HLKK
  • Advens AG
  • Sanitär
  • Haldemann Basel
  • Brandschutz
  • Visiotec Technical Consulting AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Installation and conversion work for Medartis AG at its headquarters in Stücki Park Basel.

Medartis expansions

Installation and conversion work for Medartis AG at its headquarters in Stücki Park Basel.

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Novartis Campus WSJ-182

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

Study contract for the Bricks area

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

High-bay warehouse of the paint manufacturer Caparol

Production and Sales point Caparol

Tenant change of the paint manufacturer Caparol into an existing business and commercial property.

Conversion of a commercial and apartment building into a spacious detached house.

SFH Riehen

Conversion of a commercial and apartment building into a spacious detached house.

View from the entrance zone into the cafeteria

Brisoft

Installation of new office space for Brisoft AG.

Addition to a detached single-family house with a separate pavilion in timber construction.

SFH Laufen

Addition to a detached single-family house with a separate pavilion in timber construction.

New construction of a detached house on an exposed hillside location.

SFH Bottmingen

New construction of a detached house on an exposed hillside location.

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Mittlere Strasse

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

Installation of a travel agency for Hotelplan AG with an atmospheric ambience.

Travel agency Travel Mart

Installation of a travel agency for Hotelplan AG with an atmospheric ambience.