Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Basel
Education
Text Link
Health
Text Link

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

  • Client
  • Rhystadt AG
    Rhystadt AG
  • Location
  • Basel
  • Mandate form
  • Architecture
    General planning
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Tenant fit out
    Conversion/Renovation
  • Duration
  • 09.2020
    —heute
    —07.2021
    0 Days
Temporary facilities at Klybeck health schools

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Temporary facilities at Klybeck health schools

The BZG and BfG health schools of the cantons of Basel-Stadt and Baselland were located in the Spenglerpark buildings in Münchenstein. As a result of the complete renovation of these buildings, they were temporarily housed in five existing buildings on the Klybeck site. A total of approx. 20,000 m2 of temporary school space was created there for around 1,600 users.

Blaser Architekten worked as general planners for the landowner Rhystadt AG, Basel. We were also responsible for the tenant fit-outs, including relocation planning, IT and security.

The depth of penetration into the buildings varied greatly due to the different condition of the buildings and the user requirements. The spatial programme included the creation of various classrooms for frontal and studio teaching, exercise rooms, laboratories, administration and various recreation and social rooms. A fully functional ward was installed for the training of nursing staff so that students can fully simulate the nursing situation in hospitals.

Construction began in mid-November 2020 and the school opened on schedule at the beginning of August 2021, at the start of the new academic year.

Project information

  • GV SIA 416 m3
  • 125'100
  • GF SIA 416 m2
  • 32'766
  • Nutzfläche m2
  • 19'400
  • Fotografie
  • Michael Fritschi

Technical Planning

  • Statik
  • Gruner Lüem AG
  • Elektro
  • Edeco AG
  • HLKK
  • herrmann & partner Energietechnik GmbH
  • Sanitär
  • Festa Engineering GmbH
  • Bauphysik/Akustik
  • Ehrsam Bauphysik AG
  • Landschaft
  • Jacob Planung
  • Schadstoffe
  • Carbotech AG
  • Brandschutz
  • Gruner AG
  • Laborplaner
  • Laborplaner Tonelli AG
Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Conversion of a former sales area into a Euro-Asian restaurant with different guest zones.

Restaurant NOOHN

Conversion of a former sales area into a Euro-Asian restaurant with different guest zones.

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

SFH Pfeffingen

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

Extension of an existing detached house with additional living space and access via a stair tower in the extension.

SFH Röschenz

Extension of an existing detached house with additional living space and access via a stair tower in the extension.

H&M Thun

H&M Stores

Renovation Work for the Swedish Fashion Company Hennes & Mauritz – Implementation of Corporate Architecture.

The first publicly accessible building on the Novartis Campus.

Novartis Campus WSJ-189 Pavillon

The first publicly accessible building on the Novartis Campus.

Passerelle

Viollier AG

Construction to optimise workflows and new construction of a walkway to streamline internal routes.

View top-floor apartment

Multi-family house in Binningen

New construction of a modern multi-family residence in Binningen – urban living with timeless design.

Competition for the new headquarters of Swatch AG in Biel in collaboration with Shigeru Ban Architects.

Swatch Omega SO51

Competition for the new headquarters of Swatch AG in Biel in collaboration with Shigeru Ban Architects.

Installation of the second company site of Lonza AG at the Lonza Tower in Basel.

Lonza AG

Installation of the second company site of Lonza AG at the Lonza Tower in Basel.

Conversion of a commercial and apartment building into a spacious detached house.

SFH Riehen

Conversion of a commercial and apartment building into a spacious detached house.