Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Basel
Education
Text Link
Health
Text Link

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

  • Client
  • Rhystadt AG
    Rhystadt AG
  • Location
  • Basel
  • Mandate form
  • Architecture
    General planning
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Tenant fit out
    Conversion/Renovation
  • Duration
  • 09.2020
    —heute
    —07.2021
    0 Days
Temporary facilities at Klybeck health schools

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Temporary facilities at Klybeck health schools

The BZG and BfG health schools of the cantons of Basel-Stadt and Baselland were located in the Spenglerpark buildings in Münchenstein. As a result of the complete renovation of these buildings, they were temporarily housed in five existing buildings on the Klybeck site. A total of approx. 20,000 m2 of temporary school space was created there for around 1,600 users.

Blaser Architekten worked as general planners for the landowner Rhystadt AG, Basel. We were also responsible for the tenant fit-outs, including relocation planning, IT and security.

The depth of penetration into the buildings varied greatly due to the different condition of the buildings and the user requirements. The spatial programme included the creation of various classrooms for frontal and studio teaching, exercise rooms, laboratories, administration and various recreation and social rooms. A fully functional ward was installed for the training of nursing staff so that students can fully simulate the nursing situation in hospitals.

Construction began in mid-November 2020 and the school opened on schedule at the beginning of August 2021, at the start of the new academic year.

Project information

  • GV SIA 416 m3
  • 125'100
  • GF SIA 416 m2
  • 32'766
  • Nutzfläche m2
  • 19'400
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik
  • Gruner Lüem AG
  • Elektro
  • Edeco AG
  • HLKK
  • herrmann & partner Energietechnik GmbH
  • Sanitär
  • Festa Engineering GmbH
  • Bauphysik/Akustik
  • Ehrsam Bauphysik AG
  • Landschaft
  • Jacob Planung
  • Schadstoffe
  • Carbotech AG
  • Brandschutz
  • Gruner AG
  • Laborplaner
  • Laborplaner Tonelli AG
Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

View of the aisle area with round play corner

SIS Schule

Tenant fit-out for the Swiss International School in Building D of the Main Campus Allschwil.

State-of-the-art operating unit for training purposes

Training center Medartis

Installation of state-of-the-art operating units as well as open office space and meeting zones for the International Bone Research Association (IBRA)

New construction of a spacious detached house with a view of the Passwang.

SFH Himmelried

New construction of a spacious detached house with a view of the Passwang.

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

Competition Art Museum

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

Installation of a private banking department for Basler Kantonalbank.

BKB Private Banking

Installation of a private banking department for Basler Kantonalbank.

Expansion of a Credit Suisse branch in Allschwil.

Credit Suisse Allschwil

Expansion of a Credit Suisse branch in Allschwil.

High-bay warehouse of the paint manufacturer Caparol

Production and Sales point Caparol

Tenant change of the paint manufacturer Caparol into an existing business and commercial property.

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.

Competition Beyeler Museum

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.

Development and construction of a project for the Resort Andermatt Swiss Alps.

YARA Apartment House

Development and construction of a project for the Resort Andermatt Swiss Alps.

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Study contract for cantonal hospital

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.