Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Basel
Education
Text Link
Health
Text Link

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

  • Client
  • Rhystadt AG
    Rhystadt AG
  • Location
  • Basel
  • Mandate form
  • Architecture
    General planning
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Tenant fit out
    Conversion/Renovation
  • Duration
  • 09.2020
    —heute
    —07.2021
    0 Days
Temporary facilities at Klybeck health schools

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Temporary facilities at Klybeck health schools

The BZG and BfG health schools of the cantons of Basel-Stadt and Baselland were located in the Spenglerpark buildings in Münchenstein. As a result of the complete renovation of these buildings, they were temporarily housed in five existing buildings on the Klybeck site. A total of approx. 20,000 m2 of temporary school space was created there for around 1,600 users.

Blaser Architekten worked as general planners for the landowner Rhystadt AG, Basel. We were also responsible for the tenant fit-outs, including relocation planning, IT and security.

The depth of penetration into the buildings varied greatly due to the different condition of the buildings and the user requirements. The spatial programme included the creation of various classrooms for frontal and studio teaching, exercise rooms, laboratories, administration and various recreation and social rooms. A fully functional ward was installed for the training of nursing staff so that students can fully simulate the nursing situation in hospitals.

Construction began in mid-November 2020 and the school opened on schedule at the beginning of August 2021, at the start of the new academic year.

Project information

  • GV SIA 416 m3
  • 125'100
  • GF SIA 416 m2
  • 32'766
  • Nutzfläche m2
  • 19'400
  • Fotografie
  • Michael Fritschi

Technical Planning

  • Statik
  • Gruner Lüem AG
  • Elektro
  • Edeco AG
  • HLKK
  • herrmann & partner Energietechnik GmbH
  • Sanitär
  • Festa Engineering GmbH
  • Bauphysik/Akustik
  • Ehrsam Bauphysik AG
  • Landschaft
  • Jacob Planung
  • Schadstoffe
  • Carbotech AG
  • Brandschutz
  • Gruner AG
  • Laborplaner
  • Laborplaner Tonelli AG
Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Exterior view of the object

Owner-occupied apartment Weiherweg

Core refurbishment of a condominium with 360° panoramic views over Basel, adjacent to Schützenmattpark.

Installation of a beach hall under the bridgehead of the Luzernerring bridge in St. Johann, Basel.

Beach volleyball and soccer hall

Installation of a beach hall under the bridgehead of the Luzernerring bridge in St. Johann, Basel.

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Bionic Training

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Two-stage refurbishment and upgrading of a detached house from the 1970s.

SFH Binningen

Two-stage refurbishment and upgrading of a detached house from the 1970s.

Primeo Energie

Primeo Energie

Refurbishment and Conversion of Primeo Office Space, Münchenstein – Reinterpreting Existing Work Environments

Work table with children's toys

Rear building Austrasse

Remodelling of a former workshop building in the rear courtyard and usable space in the front building for Heime Auf Berg AG.

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Bau 860

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Staircase from top to bottom

Lonza AG in the SP extension buildings

Installation of offices and laboratories for Lonza AG in the extension buildings in Stücki Park Basel.

Rendering Competition Spiez Laboratory

Study Spiez Laboratory

Comprehensive Service Study for the New Construction of Spiez Laboratory with Renovation of the Highly Toxic Building, Workshop Building, and Energy Center.

Renovation of the entire property in Basel's shopping mile with new utilisation of the building.

Freie Strasse residential and commercial building

Renovation of the entire property in Basel's shopping mile with new utilisation of the building.