Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Basel
Education
Text Link
Health
Text Link

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

  • Client
  • Rhystadt AG
    Rhystadt AG
  • Location
  • Basel
  • Mandate form
  • Architecture
    General planning
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Tenant fit out
    Conversion/Renovation
  • Duration
  • 09.2020
    —heute
    —07.2021
    0 Days
Temporary facilities at Klybeck health schools

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Temporary facilities at Klybeck health schools

The BZG and BfG health schools of the cantons of Basel-Stadt and Baselland were located in the Spenglerpark buildings in Münchenstein. As a result of the complete renovation of these buildings, they were temporarily housed in five existing buildings on the Klybeck site. A total of approx. 20,000 m2 of temporary school space was created there for around 1,600 users.

Blaser Architekten worked as general planners for the landowner Rhystadt AG, Basel. We were also responsible for the tenant fit-outs, including relocation planning, IT and security.

The depth of penetration into the buildings varied greatly due to the different condition of the buildings and the user requirements. The spatial programme included the creation of various classrooms for frontal and studio teaching, exercise rooms, laboratories, administration and various recreation and social rooms. A fully functional ward was installed for the training of nursing staff so that students can fully simulate the nursing situation in hospitals.

Construction began in mid-November 2020 and the school opened on schedule at the beginning of August 2021, at the start of the new academic year.

Project information

  • GV SIA 416 m3
  • 125'100
  • GF SIA 416 m2
  • 32'766
  • Nutzfläche m2
  • 19'400
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik
  • Gruner Lüem AG
  • Elektro
  • Edeco AG
  • HLKK
  • herrmann & partner Energietechnik GmbH
  • Sanitär
  • Festa Engineering GmbH
  • Bauphysik/Akustik
  • Ehrsam Bauphysik AG
  • Landschaft
  • Jacob Planung
  • Schadstoffe
  • Carbotech AG
  • Brandschutz
  • Gruner AG
  • Laborplaner
  • Laborplaner Tonelli AG
Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Installation of a private banking department for Basler Kantonalbank.

BKB Private Banking

Installation of a private banking department for Basler Kantonalbank.

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Novartis Campus WSJ-386 ONC

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Novartis Campus WSJ-182

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

H&M Thun

H&M Filialen

Renovation Work for the Swedish Fashion Company Hennes & Mauritz – Implementation of Corporate Architecture.

Passerelle

Viollier AG

Construction to optimise workflows and new construction of a walkway to streamline internal routes.

Integration of a company specialising in biopharmaceuticals into the Main Campus.

T3 Pharmaceuticals

Integration of a company specialising in biopharmaceuticals into the Main Campus.

Competition project for the Lüdin Area in Liestal in collaboration with Karpf Khalili Architects, New York.

Competition Lüdin Area

Competition project for the Lüdin Areal in Liestal in collaboration with Karpf Khalili Architects, New York.

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

The Circle at Zürich Airport

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

Credit Suisse Reinach

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

High-bay warehouse of the paint manufacturer Caparol

Production and Sales point Caparol

Tenant change of the paint manufacturer Caparol into an existing business and commercial property.