Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Basel
Education
Text Link
Health
Text Link

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

  • Client
  • Rhystadt AG
    Rhystadt AG
  • Location
  • Basel
  • Mandate form
  • Architecture
    General planning
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Tenant fit out
    Conversion/Renovation
  • Duration
  • 09.2020
    —heute
    —07.2021
    0 Days
Temporary facilities at Klybeck health schools

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Temporary facilities at Klybeck health schools

The BZG and BfG health schools of the cantons of Basel-Stadt and Baselland were located in the Spenglerpark buildings in Münchenstein. As a result of the complete renovation of these buildings, they were temporarily housed in five existing buildings on the Klybeck site. A total of approx. 20,000 m2 of temporary school space was created there for around 1,600 users.

Blaser Architekten worked as general planners for the landowner Rhystadt AG, Basel. We were also responsible for the tenant fit-outs, including relocation planning, IT and security.

The depth of penetration into the buildings varied greatly due to the different condition of the buildings and the user requirements. The spatial programme included the creation of various classrooms for frontal and studio teaching, exercise rooms, laboratories, administration and various recreation and social rooms. A fully functional ward was installed for the training of nursing staff so that students can fully simulate the nursing situation in hospitals.

Construction began in mid-November 2020 and the school opened on schedule at the beginning of August 2021, at the start of the new academic year.

Project information

  • GV SIA 416 m3
  • 125'100
  • GF SIA 416 m2
  • 32'766
  • Nutzfläche m2
  • 19'400
  • Fotografie
  • Michael Fritschi

Technical Planning

  • Statik
  • Gruner Lüem AG
  • Elektro
  • Edeco AG
  • HLKK
  • herrmann & partner Energietechnik GmbH
  • Sanitär
  • Festa Engineering GmbH
  • Bauphysik/Akustik
  • Ehrsam Bauphysik AG
  • Landschaft
  • Jacob Planung
  • Schadstoffe
  • Carbotech AG
  • Brandschutz
  • Gruner AG
  • Laborplaner
  • Laborplaner Tonelli AG
Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

Credit Suisse Claraplatz

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.

Competition Beyeler Museum

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.

Expansion of production areas and offices at the headquarters of Medartis AG in Stücki Park in Basel.

Medartis production expansion

Expansion of production areas and offices at the headquarters of Medartis AG in Stücki Park in Basel.

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.

Landgasthof Riehen

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.

New construction of a spacious detached house with a view of the Passwang.

SFH Himmelried

New construction of a spacious detached house with a view of the Passwang.

Development and construction of a project for the Resort Andermatt Swiss Alps.

YARA Apartment House

Development and construction of a project for the Resort Andermatt Swiss Alps.

Enlargement of an existing Masionette flat by an additional storey.

Flat Offenburgerstrasse

Enlargement of an existing Masionette flat by an additional storey.

Planning and realisation of an office and laboratory building on the Novartis Campus for the design architect Yoshio Taniguchi from Tokyo.

Novartis Campus WSJ-155

Planning and realisation of an office and laboratory building on the Novartis Campus for the design architect Yoshio Taniguchi from Tokyo.

Insight into the kitchen on the top floor

Multi-family House Bäumlihofstrasse

Conversion and renovation of four almost identical apartment buildings on Bäumlihofstrasse in the popular Hirzbrunnen district.

Mieterausbauten HORTUS

Tenant Fit-Out HORTUS

Tenant Fit-Outs HORTUS – Flexible and Sustainable Working in Allschwil