Refurbishment of a residential complex designed by architect Walter Senn in 1965.

MFH Birshöhe

Muttenz
Residential
Text Link

Refurbishment of a residential complex designed by architect Walter Senn in 1965.

  • Client
  • Schweizerische Bundesbahnen SBB Immobilien
    Schweizerische Bundesbahnen SBB Immobilien
  • Location
  • Muttenz
  • Mandate form
  • Architecture
    General planning
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 04.2005
    —heute
    —09.2007
    0 Days
MFH Birshöhe

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

MFH Birshöhe

Blaser Architekten were commissioned by SBB Immobilien to develop a construction project for the renovation of apartment blocks 91-95, with the aim of bringing the quality of living up to current rental flat standards by providing attractive and contemporary facilities.

The properties, built in 1965, were designed by architect Walter Senn as pure leca concrete buildings. The interior walls have a static function and so only on the attic floor were flats (5 1/2 rooms) realised. The remaining storeys are made up of 3 1/2 and 4 room flats. A total of 127 flats were renovated in three construction phases.

Project information

  • GV SIA 416 m3
  • 47'650
  • GF SIA 416 m2
  • 15'625
  • Nutzfläche m2
  • 10'414
  • Fotografie
  • Archiv Blaser Architekten AG

Technical Planning

  • Elektro
  • Schwarz + Partner AG
  • HLK
  • Advens AG
  • Sanitär
  • Haldemann Basel
  • Landschaft
  • Dipol Landschaftsarchitekten GmbH

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Study contract for cantonal hospital

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Turnhalle

Building trade Vocational School

Replacement building for the Zürich Vocational School for the Construction Industry due to the sharp increase in student numbers.

View of the spacious, bright kitchen

MFH Mittlere Strasse

Conversion and renovation of an existing property.

A modern office interior, bright, with wood, which offers space for concentrated work alone or meetings in different group sizes.

SIP Switzerland Innovation Park

A modern office interior, bright, with wood, which offers space for concentrated work alone or meetings in different group sizes.

The store from the outside

Superdry Shop

Installation of the first Superdry shop in Zürich, Switzerland.

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Friedensgasse

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Bionic Training

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

The Circle at Zürich Airport

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

Installation of a highly sensitive B laboratory for a major healthcare company in Basel.

Biosafety Facility

Installation of a highly sensitive B laboratory for a major healthcare company in Basel.