Installation of a COS store on the ground and upper floors of the former Musik Hug building.

COS Store

Basel
Retail
Text Link

Installation of a COS branch on the ground and upper floors of the former Musik Hug building.

  • Client
  • H&M Hennes & Mauritz AG
    H&M Hennes & Mauritz AG
  • Location
  • Basel
  • Mandate form
  • Architecture
    General planning
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
    Tenant fit out
  • Duration
  • 02.2017
    —heute
    —03.2018
    0 Days
COS Store

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

COS Store

On 15 June 2018, the Swedish fashion group H&M opened a branch of its premium label COS in Basel, making it the fifth shop in the 'Collection of Style' in Switzerland.

The sales area in the former Musik Hug building on Freie Strasse is around 600 m2 and is spread over the ground and upper floors. A prestigious staircase connects the two open-plan floors, which are only divided by the presentation of goods. Architecturally, great attention was paid to the completely redesigned façade on the ground floor. The shop windows, which were modelled on the historical structure, were enlarged to improve the visibility and lighting of the shop. The building and its surroundings are significantly enhanced by the new stone façade.

We began with the demolition, refurbishment and upgrading measures in September 2017, and the shop fit-out began in March 2018.

Project information

  • GV SIA 416 m3
  • 3'748
  • GF SIA 416 m2
  • 898
  • Nutzfläche m2
  • 707
  • Fotografie
  • courtesy of COS

Technical Planning

  • Elektro
  • Edeco AG
  • HLKK
  • herrmann & partner Energietechnik GmbH
  • Brandschutz
  • Visiotec Technical Consulting AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Renovation and remodelling of an old flat with a view of the Rhine.

Apartment Mühlenberg

Renovation and remodelling of an old flat with a view of the Rhine.

Conversion of a listed building with residential use on the ground floor.

Neubad residential and office building

Conversion of a listed building with residential use on the ground floor.

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

Credit Suisse Claraplatz

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Novartis Campus WSJ-386 ONC

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Bau 860

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Primeo Energie

Primeo Energie

Refurbishment and Conversion of Primeo Office Space, Münchenstein – Reinterpreting Existing Work Environments

Construction of a new day care centre in Stein (AG) for the children of Novartis employees.

Day care centre Stein

Construction of a new day care centre in Stein (AG) for the children of Novartis employees.

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Medartis

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Integration of a company specialising in biopharmaceuticals into the Main Campus.

T3 Pharmaceuticals

Integration of a company specialising in biopharmaceuticals into the Main Campus.

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Aeschenvorstadt residential and commercial building

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.