Conversion of a listed building with residential use on the ground floor.

Neubad residential and office building

Binningen
Residential
Text Link
Office/Administration
Text Link

Conversion of a listed building with residential use on the ground floor.

  • Client
  • P&F Immobilien AG
    P&F Immobilien AG
  • Location
  • Binningen
  • Mandate form
  • Architect
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 11.2020
    —heute
    —02.2022
    0 Days
Neubad residential and office building

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Neubad residential and office building

The search for a new tenant for the traditional Neubad restaurant in Binningen revealed that the continued operation of the restaurant premises was no longer appropriate. Blaser Architekten developed a concept for the listed building with residential use on the ground floor. The commercial uses on the 1st and 2nd floors were retained.

In place of the restaurant, 3 flats were created with flat sizes ranging from 2.5 to 3.5 rooms. The flats are accessed via two entrances to the building. Each flat has its own garden unit.

On the first floor, the existing office space was divided into 2 individual office areas with new kitchenettes, the bathrooms were remodelled and the room layout adapted.

The building services for the entire property had to be comprehensively modernised. A new gas heating system with an air/water heat pump was installed. The spring water pipe, which previously led directly into the building, was channelled into the Dorenbach stream.

Project information

  • GV SIA 416 m3
  • 4'060
  • GF SIA 416 m2
  • 1'380
  • Nutzfläche m2
  • 1'180
  • Fotografie
  • Michael Fritschi

Partner

  • Statik  
  • Jauslin Stebler AG
  • Elektro  
  • Pro Engineering AG
  • HLK  
  • Stokar und Partner AG
  • Sanitär  
  • Unico Gebäudetechnik AG
  • Bauphysik  
  • Ehrsam Bauphysik AG    
  • Landschaft  
  • Jacob Planung    
Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

The success of the competition in collaboration with Grafon Architects from Ireland has laid the foundation stone for the future university quarter.

Dreispitz university quarter study contract

The success of the competition in collaboration with Grafon Architects from Ireland has laid the foundation stone for the future university quarter.

Extension of an existing detached house with additional living space and access via a stair tower in the extension.

SFH Röschenz

Extension of an existing detached house with additional living space and access via a stair tower in the extension.

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Medartis

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Novartis Campus WSJ-386 ONC

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

New replacement building in a quiet residential neighbourhood on Basel's Bruderholz.

MFH C.F Meyer-Strasse 43

New replacement building in a quiet residential neighbourhood on Basel's Bruderholz.

Installation of a Ferrari-Maserati garage in existing shed halls.

Ferrari Maserati garage

Installation of a Ferrari-Maserati garage in existing shed halls.

Installation and conversion work for Medartis AG at its headquarters in Stücki Park Basel.

Medartis expansions

Installation and conversion work for Medartis AG at its headquarters in Stücki Park Basel.

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.

Competition Beyeler Museum

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Study contract for cantonal hospital

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

High-bay warehouse of the paint manufacturer Caparol

Production and Sales point Caparol

Tenant change of the paint manufacturer Caparol into an existing business and commercial property.