Conversion of a listed building with residential use on the ground floor.

Neubad residential and office building

Binningen
Residential
Text Link
Office/Administration
Text Link

Conversion of a listed building with residential use on the ground floor.

  • Client
  • P&F Immobilien AG
    P&F Immobilien AG
  • Location
  • Binningen
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 11.2020
    —heute
    —02.2022
    0 Days
Neubad residential and office building

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Neubad residential and office building

The search for a new tenant for the traditional Neubad restaurant in Binningen revealed that the continued operation of the restaurant premises was no longer appropriate. Blaser Architekten developed a concept for the listed building with residential use on the ground floor. The commercial uses on the 1st and 2nd floors were retained.

In place of the restaurant, 3 flats were created with flat sizes ranging from 2.5 to 3.5 rooms. The flats are accessed via two entrances to the building. Each flat has its own garden unit.

On the first floor, the existing office space was divided into 2 individual office areas with new kitchenettes, the bathrooms were remodelled and the room layout adapted.

The building services for the entire property had to be comprehensively modernised. A new gas heating system with an air/water heat pump was installed. The spring water pipe, which previously led directly into the building, was channelled into the Dorenbach stream.

Project information

  • GV SIA 416 m3
  • 4'060
  • GF SIA 416 m2
  • 1'380
  • Nutzfläche m2
  • 1'180
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik  
  • Jauslin Stebler AG
  • Elektro  
  • Pro Engineering AG
  • HLK  
  • Stokar und Partner AG
  • Sanitär  
  • Unico Gebäudetechnik AG
  • Bauphysik  
  • Ehrsam Bauphysik AG    
  • Landschaft  
  • Jacob Planung    

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Construction of a new day care centre in Stein (AG) for the children of Novartis employees.

Day care centre Stein

Construction of a new day care centre in Stein (AG) for the children of Novartis employees.

Extension of an existing detached house with additional living space and access via a stair tower in the extension.

SFH Röschenz

Extension of an existing detached house with additional living space and access via a stair tower in the extension.

Insight into the kitchen on the top floor

MFH Bäumlihofstrasse

Conversion and renovation of the first two almost identical apartment buildings on Bäumlihofstrasse in the popular Hirzbrunnen district.

Project competition organised by the Canton of Zug in collaboration with the architectural firms Miroslav Sik and Joos & Mathys Architekten.

Competition Focus Zug

Project competition organised by the Canton of Zug in collaboration with the architectural firms Miroslav Sik and Joos & Mathys Architekten.

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

Competition Art Museum

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

New replacement building in the popular Bachletten neighbourhood, interspersed with backyards.

MFH Leimenstrasse

New replacement building in the popular Bachletten neighbourhood, interspersed with backyards.

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Study contract for cantonal hospital

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

Credit Suisse Claraplatz

Complete refurbishment of Credit Suisse building with bank branch on the ground floor and offices, residential units on the upper floors.

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Bionic Training

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

View from the entrance zone into the cafeteria

Brisoft

Installation of new office space for Brisoft AG.