Conversion of a listed building with residential use on the ground floor.

Neubad residential and office building

Binningen
Residential
Text Link
Office/Administration
Text Link

Conversion of a listed building with residential use on the ground floor.

  • Client
  • P&F Immobilien AG
    P&F Immobilien AG
  • Location
  • Binningen
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 11.2020
    —heute
    —02.2022
    0 Days
Neubad residential and office building

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Neubad residential and office building

The search for a new tenant for the traditional Neubad restaurant in Binningen revealed that the continued operation of the restaurant premises was no longer appropriate. Blaser Architekten developed a concept for the listed building with residential use on the ground floor. The commercial uses on the 1st and 2nd floors were retained.

In place of the restaurant, 3 flats were created with flat sizes ranging from 2.5 to 3.5 rooms. The flats are accessed via two entrances to the building. Each flat has its own garden unit.

On the first floor, the existing office space was divided into 2 individual office areas with new kitchenettes, the bathrooms were remodelled and the room layout adapted.

The building services for the entire property had to be comprehensively modernised. A new gas heating system with an air/water heat pump was installed. The spring water pipe, which previously led directly into the building, was channelled into the Dorenbach stream.

Project information

  • GV SIA 416 m3
  • 4'060
  • GF SIA 416 m2
  • 1'380
  • Nutzfläche m2
  • 1'180
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik  
  • Jauslin Stebler AG
  • Elektro  
  • Pro Engineering AG
  • HLK  
  • Stokar und Partner AG
  • Sanitär  
  • Unico Gebäudetechnik AG
  • Bauphysik  
  • Ehrsam Bauphysik AG    
  • Landschaft  
  • Jacob Planung    

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Novartis Campus WSJ-386 ONC

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

The former start-up company Piqur moves into its own rental space in Stücki Park Basel.

Piqur

The former start-up company Piqur moves into its own rental space in Stücki Park Basel.

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

Neuweilerhof residential development

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

Work table with children's toys

Rear building Austrasse

Remodelling of a former workshop building in the rear courtyard and usable space in the front building for Heime Auf Berg AG.

Project competition organised by the Canton of Zug in collaboration with the architectural firms Miroslav Sik and Joos & Mathys Architekten.

Competition Focus Zug

Project competition organised by the Canton of Zug in collaboration with the architectural firms Miroslav Sik and Joos & Mathys Architekten.

Modernisation with extension of use following successful neighbourhood planning procedure.

Residential and commercial buildings Unterdorf

Modernisation with extension of use following successful neighbourhood planning procedure.

Insight into the kitchen on the top floor

MFH Bäumlihofstrasse

Conversion and renovation of the first two almost identical apartment buildings on Bäumlihofstrasse in the popular Hirzbrunnen district.

Rental flats and furnished flats in a residential and commercial building near Schützenmattpark.

Apartementhouse Weiherweg

Rental flats and furnished flats in a residential and commercial building near Schützenmattpark.

View top-floor apartment

Multi-family house in Binningen

New construction of a modern multi-family residence in Binningen – urban living with timeless design.