Laboratory and office building constructed in core&shell in the 'Life Sciences' area in the west of Basel.

Stücki Park

Basel
Laboratory/Research
Text Link
Office/Administration
Text Link
Industry/Commercial
Text Link

Laboratory and office building constructed in core&shell in the 'Life Sciences' area in the west of Basel.

  • Client
  • Swiss Prime Site Immobilien AG
    Swiss Prime Site Immobilien AG
  • Location
  • Basel
  • Mandate form
  • Architecture
    General planning
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • New building
    Study/Competition
  • Duration
  • 01.2002
    —heute
    —03.2012
    0 Days
Stücki Park

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Stücki Park

Alongside the Stücki and DB sites, the 23,000 m2 plot is one of the last contiguous building land reserves in the city of Basel. Based on a study competition won by Blaser Architekten, a laboratory and office building with flexible use in the 'life sciences' sector and higher-ranking businesses was built.

The concept envisaged the realisation of 'Höhenstrasse' as the entrance and communication level. Below this are the delivery area, car park and warehouse, with six laboratory and office floors above. The innovative design of the frontage with a specially developed high-tech membrane over a façade length of 232 metres made the building an eye-catcher.

Project information

  • GV SIA 416 m3
  • 190'000
  • GF SIA 416 m2
  • 47'650
  • Nutzfläche m2
  • 33'730
  • Fotografie
  • Lilli Kehl, Archiv BA AG

Technical Planning

  • Statik
  • Burger & Partner Ingenieure
  • Elektro
  • Schwarz + Partner AG
  • HLKK
  • Bures & Voith Klima Planing AG
  • Landschaft
  • Fahrni + Breitenfeld
Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.

Alte Börse

Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.

Installation of a Ferrari-Maserati garage in existing shed halls.

Ferrari Maserati garage

Installation of a Ferrari-Maserati garage in existing shed halls.

Development and construction of a project for the Resort Andermatt Swiss Alps.

YARA Apartment House

Development and construction of a project for the Resort Andermatt Swiss Alps.

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Friedensgasse

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

Integration of a company specialising in biopharmaceuticals into the Main Campus.

T3 Pharmaceuticals

Integration of a company specialising in biopharmaceuticals into the Main Campus.

View of the aisle area with round play corner

SIS Schule

Tenant fit-out for the Swiss International School in Building D of the Main Campus Allschwil.

Interior view with bar and lounge area

Restaurant hundertpunkt

Revitalisation of the catering space of the hundertpunkt restaurant in Spenglerpark Münchenstein.

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Bionic Training

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Construction of a forest hut in Niederhelfenschwil as part of the television programme 'SF Schweiz aktuell'.

Forest cabin

Construction of a forest hut in Niederhelfenschwil as part of the television programme 'SF Schweiz aktuell'.

A modern office interior, bright, with wood, which offers space for concentrated work alone or meetings in different group sizes.

SIP Switzerland Innovation Park

A modern office interior, bright, with wood, which offers space for concentrated work alone or meetings in different group sizes.