Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

Competition Art Museum

Basel
Leisure/Culture
Text Link

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

  • Client
  • Kanton Basel-Stadt
    Kanton Basel-Stadt
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Study/Competition
  • Duration
  • 04.2009
    —heute
    —10.2009
    0 Days
Competition Art Museum

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Competition Art Museum

In spring 2009, the Canton of Basel-Stadt announced an anonymous project competition in a selective procedure for the extension of the Kunstmuseum Basel on the neighbouring plot of the current Laurenz building. Blaser Architekten and Rapp Arcoplan took part in a team together with Tadao Ando.

The proposed new building takes up the urban morphology of the ambiguous site and emphasises the prismatic geometry of the skin against the solid core. Despite the strict geometric structure, generous visual contacts to the interior and exterior space are possible, while the reduced building cube allows urban views and is integrated into the urban fabric. The articulation of the volume and the continuation of the arcade create a visual connection between the museums and the city. In addition, the duality between past and present is interpreted in a contemporary way through the extension of the arcade. The highly developed transparency of the façade can be experienced from the inside to the outside and vice versa. The silhouettes of visitors and art, which can be viewed in the outer galleries, encourage passers-by to visit the museum.

Project information

  • GV SIA 416 m3
  • 78'979
  • GF SIA 416 m2
  • 11'304
  • Designarchitektur
  • Tadao Ando

Technical Planning

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Installation of a technology park for start-up companies in Stücki Park Basel.

Technology Park I

Installation of a technology park for start-up companies in Stücki Park Basel.

Refurbishment of the front and rear buildings and installation of new flats in a building complex from the 1960s.

MFH Missionsstrasse

Refurbishment of the front and rear buildings and installation of new flats in a building complex from the 1960s.

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Swissmetal site development

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Conversion and extension of a shop in the centre of Basel.

Boutique Interio

Conversion and extension of a shop in the centre of Basel.

Modernisation with extension of use following successful neighbourhood planning procedure.

Residential and commercial buildings Unterdorf

Modernisation with extension of use following successful neighbourhood planning procedure.

Competition for the clarification of future potentials and the development of the external space of EuroAirport Basel-Mulhouse.

EuroAirport rail link competition

Competition for the clarification of future potentials and the development of the external space of EuroAirport Basel-Mulhouse.

Data centre with external technical rooms for the Markant company in Offenburg.

Data centre Markant

Data centre with external technical rooms for the Markant company in Offenburg.

Planning and realisation of an office and laboratory building on the Novartis Campus for the design architect Yoshio Taniguchi from Tokyo.

Novartis Campus WSJ-155

Planning and realisation of an office and laboratory building on the Novartis Campus for the design architect Yoshio Taniguchi from Tokyo.

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

Huntsman Advanced Materials

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

New location for the SSEF (Swiss Gemmological Institute) with spacious, state-of-the-art laboratories.

Stiftung Schweizer­isches Gemmolo­gisches Institut

New location for the SSEF (Swiss Gemmological Institute) with spacious, state-of-the-art laboratories.