Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

Competition Art Museum

Basel
Leisure/Culture
Text Link

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

  • Client
  • Kanton Basel-Stadt
    Kanton Basel-Stadt
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Study/Competition
  • Duration
  • 04.2009
    —heute
    —10.2009
    0 Days
Competition Art Museum

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Competition Art Museum

In spring 2009, the Canton of Basel-Stadt announced an anonymous project competition in a selective procedure for the extension of the Kunstmuseum Basel on the neighbouring plot of the current Laurenz building. Blaser Architekten and Rapp Arcoplan took part in a team together with Tadao Ando.

The proposed new building takes up the urban morphology of the ambiguous site and emphasises the prismatic geometry of the skin against the solid core. Despite the strict geometric structure, generous visual contacts to the interior and exterior space are possible, while the reduced building cube allows urban views and is integrated into the urban fabric. The articulation of the volume and the continuation of the arcade create a visual connection between the museums and the city. In addition, the duality between past and present is interpreted in a contemporary way through the extension of the arcade. The highly developed transparency of the façade can be experienced from the inside to the outside and vice versa. The silhouettes of visitors and art, which can be viewed in the outer galleries, encourage passers-by to visit the museum.

Project information

  • GV SIA 416 m3
  • 78'979
  • GF SIA 416 m2
  • 11'304
  • Designarchitektur
  • Tadao Ando

Technical Planning

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Communication zone with wooden seating

Bright Peak Thera­­peutics

Installation of laboratory and office space for the young biotechnology company Bright Peak Therarpeutics on the Main Campus in Allschwil.

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.

Landgasthof Riehen

Refurbishment of a high-quality restaurant with replacement extension in the village centre of Riehen.

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Dreispitz university quarter study contract

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Renovation of the entire property in Basel's shopping mile with new utilisation of the building.

Freie Strasse residential and commercial building

Renovation of the entire property in Basel's shopping mile with new utilisation of the building.

Modernisation with extension of use following successful neighbourhood planning procedure.

Residential and commercial buildings Unterdorf

Modernisation with extension of use following successful neighbourhood planning procedure.

Interior Fit-Out Skills Lab

Skills Lab

USB Simulation Centre at Switzerland Innovation Park Area

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

The Circle at Zürich Airport

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

Turnhalle

Building trade Vocational School

Replacement building for the Zürich Vocational School for the Construction Industry due to the sharp increase in student numbers.

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Medartis

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.