Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

Competition Art Museum

Basel
Leisure/Culture
Text Link

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

  • Client
  • Kanton Basel-Stadt
    Kanton Basel-Stadt
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Study/Competition
  • Duration
  • 04.2009
    —heute
    —10.2009
    0 Days
Competition Art Museum

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Competition Art Museum

In spring 2009, the Canton of Basel-Stadt announced an anonymous project competition in a selective procedure for the extension of the Kunstmuseum Basel on the neighbouring plot of the current Laurenz building. Blaser Architekten and Rapp Arcoplan took part in a team together with Tadao Ando.

The proposed new building takes up the urban morphology of the ambiguous site and emphasises the prismatic geometry of the skin against the solid core. Despite the strict geometric structure, generous visual contacts to the interior and exterior space are possible, while the reduced building cube allows urban views and is integrated into the urban fabric. The articulation of the volume and the continuation of the arcade create a visual connection between the museums and the city. In addition, the duality between past and present is interpreted in a contemporary way through the extension of the arcade. The highly developed transparency of the façade can be experienced from the inside to the outside and vice versa. The silhouettes of visitors and art, which can be viewed in the outer galleries, encourage passers-by to visit the museum.

Project information

  • GV SIA 416 m3
  • 78'979
  • GF SIA 416 m2
  • 11'304
  • Designarchitektur
  • Tadao Ando

Technical Planning

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

SFH Pfeffingen

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

Interior view with bar and lounge area

Restaurant hundertpunkt

Revitalisation of the catering space of the hundertpunkt restaurant in Spenglerpark Münchenstein.

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Bionic Training

Since summer 2016, you can complete a full workout in 20 minutes using the new EMS (electronic muscle stimulation) training programme at Grenzacherstrasse 62 in Basel.

Construction of a forest hut in Niederhelfenschwil as part of the television programme 'SF Schweiz aktuell'.

Forest cabin

Construction of a forest hut in Niederhelfenschwil as part of the television programme 'SF Schweiz aktuell'.

Expansion of a Credit Suisse branch in Allschwil.

Credit Suisse Allschwil

Expansion of a Credit Suisse branch in Allschwil.

The first publicly accessible building on the Novartis Campus.

Novartis Campus WSJ-189 Pavillon

The first publicly accessible building on the Novartis Campus.

Designetwurf by Studiopez

Competition Teatro Kursaal di Locarno

Participation in the Competition: Harmonious Redesign of Teatro and Kursaal Locarno.

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Friedensgasse

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

Expansion of the Basel Technology Park in Stücki Park.

Technology Park II

Expansion of the Basel Technology Park in Stücki Park.

New construction of a spacious detached house with a view of the Passwang.

SFH Himmelried

New construction of a spacious detached house with a view of the Passwang.