Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

Competition Art Museum

Basel
Leisure/Culture
Text Link

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

  • Client
  • Kanton Basel-Stadt
    Kanton Basel-Stadt
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Study/Competition
  • Duration
  • 04.2009
    —heute
    —10.2009
    0 Days
Competition Art Museum

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Competition Art Museum

In spring 2009, the Canton of Basel-Stadt announced an anonymous project competition in a selective procedure for the extension of the Kunstmuseum Basel on the neighbouring plot of the current Laurenz building. Blaser Architekten and Rapp Arcoplan took part in a team together with Tadao Ando.

The proposed new building takes up the urban morphology of the ambiguous site and emphasises the prismatic geometry of the skin against the solid core. Despite the strict geometric structure, generous visual contacts to the interior and exterior space are possible, while the reduced building cube allows urban views and is integrated into the urban fabric. The articulation of the volume and the continuation of the arcade create a visual connection between the museums and the city. In addition, the duality between past and present is interpreted in a contemporary way through the extension of the arcade. The highly developed transparency of the façade can be experienced from the inside to the outside and vice versa. The silhouettes of visitors and art, which can be viewed in the outer galleries, encourage passers-by to visit the museum.

Project information

  • GV SIA 416 m3
  • 78'979
  • GF SIA 416 m2
  • 11'304
  • Designarchitektur
  • Tadao Ando

Fachplanung

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

Neuweilerhof residential development

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

View top-floor apartment

Multi-family house in Binningen

New construction of a modern multi-family residence in Binningen – urban living with timeless design.

Communication zone with wooden seating

Bright Peak Thera­­peutics

Installation of laboratory and office space for the young biotechnology company Bright Peak Therarpeutics on the Main Campus in Allschwil.

Popular neighbourhood pub in the St. Johanns Quartier with a new look.

Restaurant Johann

Popular neighbourhood pub in the St. Johanns Quartier with a new look.

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Novartis Campus WSJ-386 ONC

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

Credit Suisse Reinach

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Replacement construction of an apartment block in the conservation zone.

MFH Lindenhof­strasse

Replacement construction of an apartment block in the conservation zone.

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

SFH Pfeffingen

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

Extension to a detached house in Bottmingen built by Blaser Architekten.

Extension SFH Bottmingen

Extension to a detached house in Bottmingen built by Blaser Architekten.