Work table with children's toys

Front and rear building Austrasse 32

Basel
Health
Text Link
Residential
Text Link

Remodelling of a former workshop building in the rear courtyard and usable space in the front building for Heime Auf Berg AG.

  • Client
  • MIREST Pensionskasse
    MIREST Pensionskasse
  • Location
  • Basel
  • Mandate form
  • Architect
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 09.2021
    —heute
    —07.2023
    0 Days
Front and rear building Austrasse 32

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Front and rear building Austrasse 32

Blaser Architekten were commissioned by the owner of the rear building at Austrasse 32 in Basel to draw up a study on how the former 3-storey workshop building could be converted into residential accommodation and then rented out, and an ideal tenant was found in the form of the Seltisberg-based institution 'Heime Auf Berg AG'. The institution offers a unique range of care and support services for infants, children, adolescents, women and families in difficult situations in north-west Switzerland. The NPO has 140 residential and care places at various locations in the cantons of Basel-Landschaft and Basel-Stadt.

Blaser Architekten converted the rear building, a former carpenter's workshop that was converted into a residential building in 1977, into living and working spaces for the purpose of family care on behalf of the Mirest pension fund (Tozzo Group). The mezzanine floor and the ground floor flat in the front building with access to the rear courtyard were also converted.

Project information

  • GV SIA 416 m3
  • 840
  • GF SIA 416 m2
  • 301
  • Nutzfläche m2
  • 250
  • Nutzer:in
  • Heime Auf Berg AG
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik
  • Beurret Degen Ingenieure AG
  • Sanitär
  • Festa Engineering GmbH
  • Bauphysik/Akustik
  • Ehrsam Bauphysik AG
  • Schadstoffe
  • Carbotech AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Insight into the kitchen on the top floor

MFH Bäumlihofstrasse

Conversion and renovation of the first two almost identical apartment buildings on Bäumlihofstrasse in the popular Hirzbrunnen district.

Fire protection refurbishment of a car park combined with a refurbishment.

Car park Hochbergerstrasse

Fire protection refurbishment of a car park combined with a refurbishment.

 Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Aeschenvorstadt residential and commercial building

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

Huntsman Advanced Materials

Conversion of existing cellular offices into an open multi-space landscape for the chemical company Huntsman.

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Swissmetal site development

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Planning and realisation of an office and laboratory building on the Novartis Campus for the design architect Yoshio Taniguchi from Tokyo.

Novartis Campus WSJ-155

Planning and realisation of an office and laboratory building on the Novartis Campus for the design architect Yoshio Taniguchi from Tokyo.

New construction of a luxurious apartment block with a view of Lake Lucerne.

MFH Ennetbürgen

New construction of a luxurious apartment block with a view of Lake Lucerne.

Construction of a new day care centre in Stein (AG) for the children of Novartis employees.

Day care centre Stein

Construction of a new day care centre in Stein (AG) for the children of Novartis employees.

Expansion of a Credit Suisse branch in Allschwil.

Credit Suisse Allschwil

Expansion of a Credit Suisse branch in Allschwil.

Staircase from top to bottom

Lonza AG in the SP extension buildings

Installation of offices and laboratories for Lonza AG in the extension buildings in Stücki Park Basel.