Installation of the second company site of Lonza AG at the Lonza Tower in Basel.

Lonza AG

Basel
Office/Administration
Text Link
Laboratory/Research
Text Link

Installation of the second company site of Lonza AG at the Lonza Tower in Basel.

  • Client
  • Swiss Prime Site Immobilien AG
    Swiss Prime Site Immobilien AG
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Tenant fit out
  • Duration
  • 02.2017
    —heute
    —07.2018
    0 Days
Lonza AG

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Lonza AG

In 2015, Lonza AG moved into its first premises in Stücki Park. Due to its growth and the positive experience from the first expansion of the core&shell areas, the company decided to rent the entire House A. Offices, laboratories, meeting rooms and a cafeteria were created here as a second location to the Lonza Tower.

The meeting rooms are concentrated on Level 0, while Level 1 is available to the Global Leadership Team and the company cafeteria (including catering). Particular emphasis was placed on an open floor plan structure and optimised communication and meeting zones.

Translated with DeepL.com (free version)

Project information

  • GV SIA 416 m3
  • 32'295
  • GF SIA 416 m2
  • 8'200
  • Nutzfläche m2
  • 6'573
  • Nachhaltigkeit
  • DGNB
  • Generalunternehmung
  • S+B Baumanagement AG
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik
  • Gruner AG
  • Elektro
  • Pro Engineering AG
  • HLKK
  • Scherrer & Partner GmbH
  • Sanitär
  • Sanplan Ingenieure AG
  • Brandschutz
  • Visiotec Technical Consulting AG
  • Labor
  • Morgan Sindall Professional Services AG
Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

New replacement building in a quiet residential neighbourhood on Basel's Bruderholz.

MFH C.F Meyer-Strasse 43

New replacement building in a quiet residential neighbourhood on Basel's Bruderholz.

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Bau 860

Conversion of former cubicle offices into a bright open-plan office with kitchen area and meeting room.

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Aeschenvorstadt residential and commercial building

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Modernisation with extension of use following successful neighbourhood planning procedure.

Residential and commercial buildings Unterdorf

Modernisation with extension of use following successful neighbourhood planning procedure.

Integration of a company specialising in biopharmaceuticals into the Main Campus.

T3 Pharmaceuticals

Integration of a company specialising in biopharmaceuticals into the Main Campus.

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Dreispitz university quarter study contract

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Expansion of production areas and offices at the headquarters of Medartis AG in Stücki Park in Basel.

Medartis production expansion

Expansion of production areas and offices at the headquarters of Medartis AG in Stücki Park in Basel.

High-bay warehouse of the paint manufacturer Caparol

Production and Sales point Caparol

Tenant change of the paint manufacturer Caparol into an existing business and commercial property.

Installation of a travel agency for Hotelplan AG with an atmospheric ambience.

Travel agency Travel Mart

Installation of a travel agency for Hotelplan AG with an atmospheric ambience.