Integration of a company specialising in biopharmaceuticals into the Main Campus.

T3 Pharmaceuticals

Allschwil
Laboratory/Research
Text Link
Office/Administration
Text Link

Integration of a company specialising in biopharmaceuticals into the Main Campus.

  • Client
  • T3 Pharmaceuticals AG
    T3 Pharmaceuticals AG
  • Location
  • Allschwil
  • Mandate form
  • Architect
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Interior design
    New building
  • Duration
  • 11.2021
    —heute
    —12.2022
    0 Days
T3 Pharmaceuticals

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

T3 Pharmaceuticals

The biopharmaceutical company T3 Pharmaceuticals specialises in the development of bacterial cancer therapies. Despite significant progress in classical therapies, there is still a high demand for novel and innovative drugs for the treatment of cancer. T3 Pharmaceuticals is dedicated to filling this gap by developing highly specific and efficient treatments using live bacteria.

Blaser Architekten, together with the general contractor Senn Ressources AG, was responsible for planning the rental space on the 4th floor of the Main Campus. We also supported the implementation planning with the specialist planning team provided by the general contractor. Laboratories for analysis and cell culture, offices and a lounge with a kitchenette were installed.

Project information

  • GV SIA 416 m3
  • 1'869
  • GF SIA 416 m2
  • 455
  • Nutzfläche m2
  • 446
  • Totalunternehmer  
  • Senn Ressources AG
  • Fotografie
  • Michael Fritschi

Partner

  • Elektro  
  • Senn Technology AG
  • HLKK  
  • Aicher, De Martin, Zweng AG
  • Akustik  
  • Kopitsis Bauphysik AG    
  • Brandschutz  
  • Gruner AG       
  • Laborplaner  
  • Laborplaner Tonelli AG    
Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Installation of the second company site of Lonza AG at the Lonza Tower in Basel.

Lonza AG expansion

Installation of the second company site of Lonza AG at the Lonza Tower in Basel.

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Swissmetal site development

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Refurbishment of a residential complex designed by architect Walter Senn in 1965.

MFH Birshöhe

Refurbishment of a residential complex designed by architect Walter Senn in 1965.

Project competition organised by the Canton of Zug in collaboration with the architectural firms Miroslav Sik and Joos & Mathys Architekten.

Competition Focus Zug

Project competition organised by the Canton of Zug in collaboration with the architectural firms Miroslav Sik and Joos & Mathys Architekten.

Classroom

Limmattal Vocational School

New extension for the Limmattal cantonal school in Urdorf near Zürich due to the sharp rise in pupil numbers.

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Market hall

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Laboratory and office building constructed in core&shell in the 'Life Sciences' area in the west of Basel.

Stücki Park

Laboratory and office building constructed in core&shell in the 'Life Sciences' area in the west of Basel.

Installation of a multi-space office in a square floor plan with a formerly dark centre zone.

Novartis Campus WSJ-360 5. OG

Installation of a multi-space office in a square floor plan with a formerly dark centre zone.

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.

Competition Beyeler Museum

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.

Competition for the clarification of future potentials and the development of the external space of EuroAirport Basel-Mulhouse.

EuroAirport rail link competition

Competition for the clarification of future potentials and the development of the external space of EuroAirport Basel-Mulhouse.