Fire protection refurbishment of a car park combined with a refurbishment.

Car park Hochbergerstrasse

Basel
Industry/Commercial
Text Link

Fire protection refurbishment of a car park combined with a refurbishment.

  • Client
  • Swiss Prime Site Immobilien AG
    Swiss Prime Site Immobilien AG
  • Location
  • Basel
  • Mandate form
  • Architecture
    General planning
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 07.2015
    —heute
    —06.2016
    0 Days
Car park Hochbergerstrasse

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

Car park Hochbergerstrasse

The car park on Hochbergerstrasse was also given a new, fresher look as part of a fire safety refurbishment. The two floors are now differentiated by colour, the signage concept has been revised and the entire car park is brightly lit. The ventilation centre was rebuilt.

Project information

  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik
  • Gerber Engineering GmbH
  • Ektro
  • Scherrer & Partner GmbH
  • HLKKS
  • Advens AG
  • Brandschutz
  • Visiotec Technical Consulting AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

View of the aisle area with round play corner

SIS Schule

Tenant fit-out for the Swiss International School in Building D of the Main Campus Allschwil.

Addition to a detached single-family house with a separate pavilion in timber construction.

SFH Laufen

Addition to a detached single-family house with a separate pavilion in timber construction.

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Friedensgasse

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

Central service point for various services for employees on the Novartis Campus.

Novartis Campus WSJ-502 Shop Center

Central service point for various services for employees on the Novartis Campus.

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Study contract for cantonal hospital

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Installation of a Ferrari-Maserati garage in existing shed halls.

Ferrari Maserati garage

Installation of a Ferrari-Maserati garage in existing shed halls.

High-bay warehouse of the paint manufacturer Caparol

Production and Sales point Caparol

Tenant change of the paint manufacturer Caparol into an existing business and commercial property.

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Medartis

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

View from the atrium through the glass to the floors of the building

Campus Bildung Gesundheit

Refurbishment and equipping of the Campus Bildung Gesundheit at Spenglerpark in Münchenstein.

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

The Circle at Zürich Airport

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.