Refurbishment of the front and rear buildings and installation of new flats in a building complex from the 1960s.

MFH Missionsstrasse

Basel
Residential
Text Link

Refurbishment of the front and rear buildings and installation of new flats in a building complex from the 1960s.

  • Client
  • Immobilien Basel-Stadt
    Immobilien Basel-Stadt
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
  • Duration
  • 01.2014
    —heute
    —10.2015
    0 Days
MFH Missionsstrasse

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

MFH Missionsstrasse

The complex, built in 1965, is owned by the Basel-Stadt pension fund and consists of a front and a rear building. While the front building is dominated by 3-room flats, the rear building was originally occupied by small flats and offices. The refurbishment focussed on renewing the building services and sanitary installations as well as replacing the kitchens and bathrooms. In the rear building, office space on the top floor and the space under the roof previously used as a loft were also converted into two large new flats. Three new small flats were created on the 2nd floor to replace the original offices. The renovation took place in two stages and was carried out while the building was occupied.

Project information

  • GV SIA 416 m3
  • 7'963
  • GF SIA 416 m2
  • 2'885
  • Nutzfläche m2
  • 2'452
  • Fotografie
  • Archiv Blaser Architekten AG

Technical Planning

  • Statik
  • Fuhrer, Werder + Partner
  • Elektro
  • HKG Engineering AG
  • Sanitär
  • Der Ingeniör
  • Bauphysik/Akustik
  • Gruner AG
  • Schadstoffe
  • Carbotech AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

The first publicly accessible building on the Novartis Campus.

Novartis Campus WSJ-189 Pavillon

The first publicly accessible building on the Novartis Campus.

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Market hall

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Communication zone with wooden seating

Bright Peak Thera­­peutics

Installation of laboratory and office space for the young biotechnology company Bright Peak Therarpeutics on the Main Campus in Allschwil.

Conversion of a former sales area into a Euro-Asian restaurant with different guest zones.

Restaurant NOOHN

Conversion of a former sales area into a Euro-Asian restaurant with different guest zones.

Renovation of the building envelope of an apartment block with enlargement of the balcony areas.

MFH C.F Meyer-Strasse 54

Renovation of the building envelope of an apartment block with enlargement of the balcony areas.

Expansion of production areas and offices at the headquarters of Medartis AG in Stücki Park in Basel.

Medartis production expansion

Expansion of production areas and offices at the headquarters of Medartis AG in Stücki Park in Basel.

Conversion of a commercial and apartment building into a spacious detached house.

SFH Riehen

Conversion of a commercial and apartment building into a spacious detached house.

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Novartis Campus WSJ-182

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Friedensgasse

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Medartis

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.