Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

Study contract for the Bricks area

Allschwil
Office/Administration
Text Link
Leisure/Culture
Text Link

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

  • Client
  • Losinger Construction AG
    Losinger Construction AG
  • Location
  • Allschwil
  • Mandate form
  • General planner
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Study
  • Duration
  • 08.2010
    —heute
    —10.2010
    0 Days
Study contract for the Bricks area

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Study contract for the Bricks area

The aim of the study was to clarify the development options on the Bricks site, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan. The neighbourhood plan variant proved to be more profitable. The urban development concept is based on the consideration of the four key functions: Working, living, recreation and transport.

Two new volumes will be placed on Binningerstrasse, defining the new 'gateway' to the site and opening it up to the residents (settlers). Car traffic (commuters) can be channelled through the parallel 'pit lane'. Orthogonal to Binningerstrasse, a primary traffic axis is created along which the cubatures are lined up and on which pedestrians and motorists are deliberately guided into the site at different levels.

The building density gradually decreases as you enter the site, so that the square in the southernmost part can be left open and the existing green belt can be experienced in its current dimensions. The plan is to structure the development into a basic level, where SMEs, shops and production companies can be located, and a pedestrian-friendly platform (highline) above, from which the high-rise buildings (offices, flats) will rise.

Project information

Fachplanung

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

View of the reception desk

Medical practice OrthoPlusBasel

Installation of a medical practice for orthopaedics, traumatology and rheumatology in a newly renovated commercial building.

Installation and conversion work for Medartis AG at its headquarters in Stücki Park Basel.

Medartis expansions

Installation and conversion work for Medartis AG at its headquarters in Stücki Park Basel.

Work table with children's toys

Front and rear building Austrasse 32

Remodelling of a former workshop building in the rear courtyard and usable space in the front building for Heime Auf Berg AG.

Blick in ein Patientenzimmer Richtung Fenster

USB Patient room additionally insured

Umbau von Patientenzimmer für Zusatzversicherte in Etappen

Turnhalle

Building trade Vocational School

Replacement building for the Zürich Vocational School for the Construction Industry due to the sharp increase in student numbers.

Interior view with bar and lounge area

Restaurant hundertpunkt

Revitalisation of the catering space of the hundertpunkt restaurant in Spenglerpark Münchenstein.

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Swissmetal site development

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Beispiele Gebäudetechnik

Construction of building services systems

As an architectural firm, we not only plan and design buildings, but also coordinate and oversee the renovation of building services systems.

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Market hall

Conversion of the listed market hall site from 1928/29 with domed building and peripheral buildings.

Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.

Alte Börse

Installation of open space offices for a clinical research organisation in the premises of the old stock exchange in Basel.