Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

Study contract for the Bricks area

Allschwil
Office/Administration
Text Link
Leisure/Culture
Text Link

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

  • Client
  • Losinger Construction AG
    Losinger Construction AG
  • Location
  • Allschwil
  • Mandate form
  • General planner
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Study
  • Duration
  • 08.2010
    —heute
    —10.2010
    0 Days
Study contract for the Bricks area

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Study contract for the Bricks area

The aim of the study was to clarify the development options on the Bricks site, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan. The neighbourhood plan variant proved to be more profitable. The urban development concept is based on the consideration of the four key functions: Working, living, recreation and transport.

Two new volumes will be placed on Binningerstrasse, defining the new 'gateway' to the site and opening it up to the residents (settlers). Car traffic (commuters) can be channelled through the parallel 'pit lane'. Orthogonal to Binningerstrasse, a primary traffic axis is created along which the cubatures are lined up and on which pedestrians and motorists are deliberately guided into the site at different levels.

The building density gradually decreases as you enter the site, so that the square in the southernmost part can be left open and the existing green belt can be experienced in its current dimensions. The plan is to structure the development into a basic level, where SMEs, shops and production companies can be located, and a pedestrian-friendly platform (highline) above, from which the high-rise buildings (offices, flats) will rise.

Project information

Fachplanung

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Conversion of a commercial and apartment building into a spacious detached house.

SFH Riehen

Conversion of a commercial and apartment building into a spacious detached house.

Single-storey detached house with studio on the edge of the building zone in Witterswil.

SFH Witterswil

Single-storey detached house with studio on the edge of the building zone in Witterswil.

Turnhalle

Building trade Vocational School

Replacement building for the Zürich Vocational School for the Construction Industry due to the sharp increase in student numbers.

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Novartis Campus WSJ-386 ONC

Installation of flexible and contemporary laboratory, office and communication zones in buildings on the edge of the Novartis Campus.

Conversion of a listed building with residential use on the ground floor.

Neubad residential and office building

Conversion of a listed building with residential use on the ground floor.

Tenant fit-out for Credit Suisse at the Liestal railway station.

Credit Suisse Liestal

Tenant fit-out for Credit Suisse at the Liestal railway station.

Passerelle

Viollier AG

Construction to optimise workflows and new construction of a walkway to streamline internal routes.

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

Competition Art Museum

Project competition for the extension of the Kunstmuseum Basel in a team with Rapp Arcoplan and the design architect Tadao Ando.

State-of-the-art operating unit for training purposes

Training center Medartis

Installation of state-of-the-art operating units as well as open office space and meeting zones for the International Bone Research Association (IBRA)

Neue Büroräume mit Blick aus dem Fenster auf die Basler Altstadt

Commercial building Spalenberg 65

Staged conversion of a commercial building in the historic centre of Basel for use by the University of Basel.