Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

Study contract for the Bricks area

Allschwil
Office/Administration
Text Link
Leisure/Culture
Text Link

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

  • Client
  • Losinger Construction AG
    Losinger Construction AG
  • Location
  • Allschwil
  • Mandate form
  • General planner
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Study
  • Duration
  • 08.2010
    —heute
    —10.2010
    0 Days
Study contract for the Bricks area

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Study contract for the Bricks area

The aim of the study was to clarify the development options on the Bricks site, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan. The neighbourhood plan variant proved to be more profitable. The urban development concept is based on the consideration of the four key functions: Working, living, recreation and transport.

Two new volumes will be placed on Binningerstrasse, defining the new 'gateway' to the site and opening it up to the residents (settlers). Car traffic (commuters) can be channelled through the parallel 'pit lane'. Orthogonal to Binningerstrasse, a primary traffic axis is created along which the cubatures are lined up and on which pedestrians and motorists are deliberately guided into the site at different levels.

The building density gradually decreases as you enter the site, so that the square in the southernmost part can be left open and the existing green belt can be experienced in its current dimensions. The plan is to structure the development into a basic level, where SMEs, shops and production companies can be located, and a pedestrian-friendly platform (highline) above, from which the high-rise buildings (offices, flats) will rise.

Project information

Partner

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.

Competition Beyeler Museum

Study contract for an extension to the Fondation Beyeler in Riehen in the neighbouring Iselin-Weber Park.

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

Neuweilerhof residential development

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

Installation of a highly sensitive B laboratory for a major healthcare company in Basel.

Biosafety Facility

Installation of a highly sensitive B laboratory for a major healthcare company in Basel.

New replacement building with consistent floor plans and loft-like living character.

MFH Dornacher­strasse

New replacement building with consistent floor plans and loft-like living character.

Conversion of a listed building with residential use on the ground floor.

Neubad residential and office building

Conversion of a listed building with residential use on the ground floor.

Extension to a detached house in Bottmingen built by Blaser Architekten.

Extension SFH Bottmingen

Extension to a detached house in Bottmingen built by Blaser Architekten.

Restoration of a residential building in the middle of an olive grove in Tuscany.

Podere La Cilera

Restoration of a residential building in the middle of an olive grove in Tuscany.

Communication zone with wooden seating

Bright Peak Thera­­peutics

Installation of laboratory and office space for the young biotechnology company Bright Peak Therarpeutics on the Main Campus in Allschwil.

Installation of a COS store on the ground and upper floors of the former Musik Hug building.

COS Store

Installation of a COS branch on the ground and upper floors of the former Musik Hug building.

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.

Study contract for cantonal hospital

Two-stage study contract for the extension and refurbishment of the Bruderholz Cantonal Hospital.