Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Mittlere Strasse

Basel
Residential
Text Link

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

  • Client
  • Zanotelli AG
    Zanotelli AG
  • Location
  • Basel
  • Mandate form
  • Architect
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Extension
    Conversion/Renovation
    New building
  • Duration
  • 11.2014
    —heute
    —07.2017
    0 Days
MFH Mittlere Strasse

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

MFH Mittlere Strasse

Blaser Architekten were commissioned to upgrade the property at Mittlere Strasse 54 (built in 1976) and make optimum use of the plot. This will be achieved with an attractive extension wing on the existing car park. The one-bedroom flats in the existing building will be extended to create three or four-bedroom flats and the gap between the two buildings on Friedensgasse will be completely closed.

The extension was given a modern appearance and set apart from the surrounding buildings. Six attractive flats with fully glazed façades and open-plan living spaces were created. The spacious floor plans are complemented by attractive outdoor spaces in the form of terraces, landscaped forecourts or a private garden.

Project information

  • GV SIA 416 m3
  • 2'209
  • GF SIA 416 m2
  • 797
  • Nutzfläche m2
  • 609
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik
  • Jauslin Stebler AG
  • Elektro
  • Bretscher Söhne AG
  • Sanitär
  • Rosenmund Haustechnik AG
  • Bauphysik/Akustik
  • Gartenmann Engineering AG
  • Brandschutz
  • Visiotec Technical Consulting AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Classroom

Limmattal Vocational School

New extension for the Limmattal cantonal school in Urdorf near Zürich due to the sharp rise in pupil numbers.

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

View of the office zone with Quietbox

Swissrockets

Conversion and refurbishment of an office space for the company Swiss Rockets AG at Picassoplatz in Basel.

Integration of a company specialising in biopharmaceuticals into the Main Campus.

T3 Pharmaceuticals

Integration of a company specialising in biopharmaceuticals into the Main Campus.

Erneuerung Küche und Bad in einer Altbauliegenschaft mit viel Charme.

Austrasse flat

Renovation of kitchen and bathroom in an old property with lots of charm.

Expansion of the Basel Technology Park in Stücki Park.

Technology Park II

Expansion of the Basel Technology Park in Stücki Park.

Project competition organised by the Canton of Zug in collaboration with the architectural firms Miroslav Sik and Joos & Mathys Architekten.

Competition Focus Zug

Project competition organised by the Canton of Zug in collaboration with the architectural firms Miroslav Sik and Joos & Mathys Architekten.

Laboratory and office building constructed in core&shell in the 'Life Sciences' area in the west of Basel.

Stücki Park

Laboratory and office building constructed in core&shell in the 'Life Sciences' area in the west of Basel.

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Medartis

Installation of production areas and offices in the entire House E in Stücki Park for the medical technology company Medartis.

Replacement construction of an apartment block in the conservation zone.

MFH Lindenhof­strasse

Replacement construction of an apartment block in the conservation zone.