Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Mittlere Strasse

Basel
Residential
Text Link

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

  • Client
  • Zanotelli AG
    Zanotelli AG
  • Location
  • Basel
  • Mandate form
  • Architect
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Extension
    Conversion/Renovation
    New building
  • Duration
  • 11.2014
    —heute
    —07.2017
    0 Days
MFH Mittlere Strasse

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

MFH Mittlere Strasse

Blaser Architekten were commissioned to upgrade the property at Mittlere Strasse 54 (built in 1976) and make optimum use of the plot. This will be achieved with an attractive extension wing on the existing car park. The one-bedroom flats in the existing building will be extended to create three or four-bedroom flats and the gap between the two buildings on Friedensgasse will be completely closed.

The extension was given a modern appearance and set apart from the surrounding buildings. Six attractive flats with fully glazed façades and open-plan living spaces were created. The spacious floor plans are complemented by attractive outdoor spaces in the form of terraces, landscaped forecourts or a private garden.

Project information

  • GV SIA 416 m3
  • 2'209
  • GF SIA 416 m2
  • 797
  • Nutzfläche m2
  • 609
  • Fotografie
  • Michael Fritschi

Partner

  • Statik
  • Jauslin Stebler AG
  • Elektro
  • Bretscher Söhne AG
  • Sanitär
  • Rosenmund Haustechnik AG
  • Bauphysik/Akustik
  • Gartenmann Engineering AG
  • Brandschutz
  • Visiotec Technical Consulting AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Expansion of the Basel Technology Park in Stücki Park.

Technology Park II

Expansion of the Basel Technology Park in Stücki Park.

New replacement building in a quiet residential neighbourhood on Basel's Bruderholz.

MFH C.F Meyer-Strasse 43

New replacement building in a quiet residential neighbourhood on Basel's Bruderholz.

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

SFH Pfeffingen

Extension to a residential building from the 1950s in a unique location in Pfeffingen.

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Swissmetal site development

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

New construction of a spacious detached house with a view of the Passwang.

SFH Himmelried

New construction of a spacious detached house with a view of the Passwang.

Installation of the first Superdry shop in Switzerland.

Superdry Shop

Installation of the first Superdry shop in Switzerland.

Conversion of a former sales area into a Euro-Asian restaurant with different guest zones.

Restaurant NOOHN

Conversion of a former sales area into a Euro-Asian restaurant with different guest zones.

Planning and realisation of an office and laboratory building on the Novartis Campus for the design architect Yoshio Taniguchi from Tokyo.

Novartis Campus WSJ-155

Planning and realisation of an office and laboratory building on the Novartis Campus for the design architect Yoshio Taniguchi from Tokyo.

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

Novartis Campus WSJ-182

Blaser Architekten / Butscher Architekten realised the office and laboratory building on the Novartis Campus as local architect for the design architect Rahul Mehrotra.

New construction of a high-quality residential development consisting of four buildings in the villa neighbourhood of Binningen.

Hasenrain residential estate

New construction of a high-quality residential development consisting of four buildings in the villa neighbourhood of Binningen.