Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

The Circle at Zürich Airport

Zürich
Office/Administration
Text Link
Gastronomy
Text Link
Leisure/Culture
Text Link
Retail
Text Link

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

  • Client
  • Flughafen Zürich AG
    Flughafen Zürich AG
  • Location
  • Zürich
  • Mandate form
  • Local architect
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • New building
  • Duration
  • 02.2012
    —heute
    —03.2015
    0 Days
The Circle at Zürich Airport

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

The Circle at Zürich Airport

The design by Japanese architecture firm Riken Yamamoto & Field Shop emerged as the winning project from a three-stage architectural competition with over 90 high-calibre entries from all over the world. The design promises to set a milestone in the architectural landscape around Zurich Airport. From the outside, the building references the large forms of the existing airport. Once inside, it conveys the experience of a city centre in miniature - with a high, urban quality of stay. The small-scale, city-centre atmosphere is a testament to typical Swiss restraint. 'The Circle' is the first global location with the ambience of a small town and the synergies of a large city. Blaser Architekten AG were involved in the project with a usable area of over 210,000 m2 as local architects. The project is now being realised by the total contractor HRS.

Project information

  • GV SIA 416 m3
  • 739'200
  • Nutzfläche m2
  • 210'000
  • Nachhaltigkeit
  • Minergie, LEED
  • Designarchitektur
  • Riken Yamamoto & Field Shop

Fachplanung

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

Two-stage refurbishment and upgrading of a detached house from the 1970s.

SFH Binningen

Two-stage refurbishment and upgrading of a detached house from the 1970s.

Project competition organised by the Canton of Zug in collaboration with the architectural firms Miroslav Sik and Joos & Mathys Architekten.

Competition Focus Zug

Project competition organised by the Canton of Zug in collaboration with the architectural firms Miroslav Sik and Joos & Mathys Architekten.

Conversion of a commercial and apartment building into a spacious detached house.

SFH Riehen

Conversion of a commercial and apartment building into a spacious detached house.

Data centre with external technical rooms for the Markant company in Offenburg.

Data centre Markant

Data centre with external technical rooms for the Markant company in Offenburg.

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

Credit Suisse Reinach

Credit Suisse in Reinach strengthened its presence on the newly designed village square.

New replacement building with consistent floor plans and loft-like living character.

MFH Dornacher­strasse

New replacement building with consistent floor plans and loft-like living character.

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

Study contract for the Bricks area

Study to clarify the development options, taking into account the zoning-compliant use in comparison with a use that requires a neighbourhood plan.

New replacement building in a quiet residential neighbourhood on Basel's Bruderholz.

MFH C.F Meyer-Strasse 43

New replacement building in a quiet residential neighbourhood on Basel's Bruderholz.

Expansion of the Basel Technology Park in Stücki Park.

Technology Park II

Expansion of the Basel Technology Park in Stücki Park.