Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

The Circle at Zürich Airport

Zürich
Office/Administration
Text Link
Leisure/Culture
Text Link
Retail
Text Link

Local Architect for the design architect Riken Yamamoto for the project phases preliminary project to tender for the largest building construction project in Switzerland.

  • Client
  • Flughafen Zürich AG
    Flughafen Zürich AG
  • Location
  • Zürich
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • New building
    Study/Competition
  • Duration
  • 02.2012
    —heute
    —03.2015
    0 Days
The Circle at Zürich Airport

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

The Circle at Zürich Airport

The design by Japanese architecture firm Riken Yamamoto & Field Shop emerged as the winning project from a three-stage architectural competition with over 90 high-calibre entries from all over the world. The design promises to set a milestone in the architectural landscape around Zurich Airport. From the outside, the building references the large forms of the existing airport. Once inside, it conveys the experience of a city centre in miniature - with a high, urban quality of stay. The small-scale, city-centre atmosphere is a testament to typical Swiss restraint. 'The Circle' is the first global location with the ambience of a small town and the synergies of a large city. Blaser Architekten AG were involved in the project with a usable area of over 210,000 m2 as local architects. The project is now being realised by the total contractor HRS.

Project information

  • GV SIA 416 m3
  • 739'200
  • Nutzfläche m2
  • 210'000
  • Nachhaltigkeit
  • Minergie, LEED
  • Designarchitektur
  • Riken Yamamoto & Field Shop

Fachplanung

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

View from the entrance zone into the cafeteria

Brisoft

Installation of new office space for Brisoft AG.

State-of-the-art operating unit for training purposes

Training center Medartis

Installation of state-of-the-art operating units as well as open office space and meeting zones for the International Bone Research Association (IBRA)

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Dreispitz university quarter study contract

The success of the competition in collaboration with Grafton Architects from Ireland has laid the foundation stone for the future university quarter.

Basic fit-out for the company Wesemann Schweiz AG in Stücki Park Basel.

Wesemann Schweiz

Basic fit-out for the company Wesemann Schweiz AG in Stücki Park Basel.

New replacement building in the popular Bachletten neighbourhood, interspersed with backyards.

MFH Leimenstrasse

New replacement building in the popular Bachletten neighbourhood, interspersed with backyards.

Expansion of production areas and offices at the headquarters of Medartis AG in Stücki Park in Basel.

Medartis production expansion

Expansion of production areas and offices at the headquarters of Medartis AG in Stücki Park in Basel.

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

Neuweilerhof residential development

Residential development on the border to Allschwil with apartment block along the street and atrium houses in the inner courtyard.

New replacement building with consistent floor plans and loft-like living character.

MFH Dornacher­strasse

New replacement building with consistent floor plans and loft-like living character.

Blick in ein Patientenzimmer Richtung Fenster

USB Patient room additionally insured

Umbau von Patientenzimmer für Zusatzversicherte in Etappen

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.

Swissmetal site development

Study to analyse the opportunities and risks of further industrial use of the Swissmetal site in Dornach.