Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

MFH Friedensgasse

Basel
Residential
Text Link

Upgrading of existing property and closing of a gap between buildings by means of an extension wing.

  • Client
  • Zanotelli AG
    Zanotelli AG
  • Location
  • Basel
  • Mandate form
  • Architecture
  • Status
  • Abgeschlossen
    Completed
    In Planung
    In planning
    In Umsetzung
    In realisation
  • Services
  • Conversion/Renovation
    New building
  • Duration
  • 11.2014
    —heute
    —07.2017
    0 Days
MFH Friedensgasse

Bevor wir Ihnen YouTube-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Bevor wir Ihnen Vimeo-Videos zeigen können, müssen wir Sie darüber informieren, dass beim Laden der Videos möglicherweise Daten an den Anbieter übermittelt werden. Mit dem Klick auf den Play Button akzeptieren Sie die Erhebung und Verarbeitung dieser Daten gemäß unserer Datenschutzerklärung.

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet.

MFH Friedensgasse

Blaser Architekten were commissioned to upgrade the property at Mittlere Strasse 54 (built in 1976) and make optimum use of the plot. This will be achieved with an attractive extension wing on the existing car park. The one-bedroom flats in the existing building will be extended to create three or four-bedroom flats and the gap between the two buildings on Friedensgasse will be completely closed.

The extension was given a modern appearance and set apart from the surrounding buildings. Six attractive flats with fully glazed façades and open-plan living spaces were created. The spacious floor plans are complemented by attractive outdoor spaces in the form of terraces, landscaped forecourts or a private garden.

Project information

  • GV SIA 416 m3
  • 2'209
  • GF SIA 416 m2
  • 797
  • Nutzfläche m2
  • 609
  • Fotografie
  • Michael Fritschi

Fachplanung

  • Statik
  • Jauslin Stebler AG
  • Elektro
  • Bretscher Söhne AG
  • Sanitär
  • Rosenmund Haustechnik AG
  • Bauphysik/Akustik
  • Gartenmann Engineering AG
  • Brandschutz
  • Visiotec Technical Consulting AG

Further related projects

Discover this project in 3D
Start 3D Experience

Can we help you with your own project?

Contact us for a personal and individual consultation.

Projects

State-of-the-art operating unit for training purposes

Training center Medartis

Installation of state-of-the-art operating units as well as open office space and meeting zones for the International Bone Research Association (IBRA)

View top-floor apartment

Multi-family house in Binningen

New construction of a modern multi-family residence in Binningen – urban living with timeless design.

Single-storey detached house with studio on the edge of the building zone in Witterswil.

SFH Witterswil

Single-storey detached house with studio on the edge of the building zone in Witterswil.

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Temporary facilities at Klybeck health schools

Installation of Povisorien health schools in five existing buildings in the Klybeck area as a result of remodelling measures in Spenglerpark Münchenstein.

Extension to a detached house in Bottmingen built by Blaser Architekten.

Extension SFH Bottmingen

Extension to a detached house in Bottmingen built by Blaser Architekten.

Staircase from top to bottom

Lonza AG in the SP extension buildings

Installation of offices and laboratories for Lonza AG in the extension buildings in Stücki Park Basel.

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

Aeschenvorstadt residential and commercial building

Refurbishment of a commercial building in a central location in Basel with extension of use to a residential and commercial building.

View of the aisle area with round play corner

SIS Schule

Tenant fit-out for the Swiss International School in Building D of the Main Campus Allschwil.

Extension of an existing detached house with additional living space and access via a stair tower in the extension.

SFH Röschenz

Extension of an existing detached house with additional living space and access via a stair tower in the extension.

The first publicly accessible building on the Novartis Campus.

Novartis Campus WSJ-189 Pavillon

The first publicly accessible building on the Novartis Campus.